12v ws2811 Bullet nodes 6′ Long Lead – 100ct string BLACK 18awg wire

$37.00

15 in stock

Use 3700 points to purchase this product!
Category: Tags: , , ,

Description

12mm 12vdc 100ct pixel nodes 18awg BLACK wire with Pigtails

 Features:
1. 12mm diameter
2. IP68 rated, epoxy resin filled design
3. Voltage 12vdc
4. 100-120 degree viewing angle
5. Max power 0.30w
6. Full RGB color / 24bit / 256 gray scale